Oliktok Point to Spy Island: Flowline Repair
Views
0
Tags
Learn how crews sleeve a corroded subsea flowline by installing a 10-in pipe inside the existing line and pushing/pulling it 3.5 miles from shore to island. A 750-ton thruster and HDD do the heavy lift while teams plan daily, verify tie-ins, and hydrotest. The Capacity Model shows up in Prevention and Capacity for Failure—engineered controls, shared learning, and tight coordination across PGI, CONAM, and MES.